Truck & trailer yards

How can truck parking yards measure local truck parking pages?

Evan Thomas, Founder, Propty

By Evan Thomas, Founder, Propty · Austin, TX

One of the sibling co-founders of Propty, from a family of property operators.

Published · Updated · Last reviewed

Title card for the truck & trailer yards answer: How can truck parking yards measure local truck parking pages?

Three measures tell you whether your yard is pulling its weight on a truck corridor: corridor access ratio, vehicle fit rate, and overnight permit lead time. Collect each one from public data, your own gate log, and the relevant city permit office.

Key points

Truck & trailer yards operators can read how Propty works for truck & trailer yards, every truck & trailer yards answer, or hear the truck & trailer yards demo. Related: What should a truck parking lease include?.

The FHWA Truck Parking Development Handbook 2026 confirms that corridor demand is highly dynamic, so a single occupancy number is not enough.

What do you need before you start measuring?

Pull these items before you open a spreadsheet.

Once you have those five inputs, the three measures below take less than an hour to calculate.

What are the three measures and how do you define them?

Measure 1: Corridor access ratio. This is the number of parking spaces in your catchment area per 100,000 daily truck VMT on the corridor. The FHWA Truck Parking Development Handbook 2026 documents the national average at 10.0 publicly-owned spaces per 100,000 daily truck VMT. Your yard's spots count toward the numerator only if they are available to the public or to registered carriers. The denominator comes from your state DOT's freight traffic data.

Measure 2: Vehicle fit rate. This is the share of spots in your yard that can physically accept the reference design vehicle. The WB-67 design vehicle, the standard 73-foot tractor-trailer combination used in U.S. highway design, is the reference for sizing stalls and drive aisles. Per published industry layout guidance from BaseCore, a compliant stall is at minimum 12 feet wide and 55 feet long for a standard semi, or roughly 75 feet long for a truck-and-trailer combination. Drive aisles must be at minimum 24 feet for one-way flow or 40 feet for two-way flow, also per BaseCore.

Measure 3: Overnight permit lead time. This is the number of calendar days between a carrier's request and the first available permitted overnight spot. Overnight parking permit processes vary by jurisdiction. Washington D.C. DDOT issues permits for no longer than two days and requires no-parking signs posted 72 hours in advance at unmetered locations and 24 hours in advance at metered locations, per ddot.dc.gov. Los Angeles LADOT requires applications at least five working days before the desired date and charges $10 per day for oversize vehicle permits up to three days, per ladotparking.org. Your own yard's process may be simpler, but if you are advising carriers on public-street permits nearby, those lead times affect whether drivers can legally park overnight.

How do you collect the data?

Hypothetical example: a 40-spot yard on a regional corridor

Hypothetical example. A yard operator in a mid-size metro has 40 spots.

That is above the national average of 10.0 documented in the FHWA Truck Parking Development Handbook 2026, which tells the operator the corridor is relatively well-served, not that the yard is full.

Vehicle fit rate: the operator measures all 40 spots. Thirty-two meet the 12-foot width and 55-foot length minimums from BaseCore. Eight older spots are only 11 feet wide.

Overnight permit lead time: the city requires five working days for an oversize vehicle permit, matching the Los Angeles LADOT standard. The operator logs this and posts it on the rate sheet so carriers know to plan ahead.

No benchmark is implied by these numbers. They are a starting point for tracking change over time in your own yard.

What are the common mistakes and edge cases?

Using occupancy alone misses the problem. Break your gate log into time bands: 6 AM to noon, noon to 6 PM, 6 PM to midnight, and midnight to 6 AM.

Mixing public and private supply inflates the corridor ratio. Only count spots that are actually available to the drivers on your corridor. A private fleet yard that never sells spots to outside carriers does not belong in your numerator.

Ignoring aisle width understates the fit problem. A spot can be long enough and wide enough but still unusable if the drive aisle is too narrow for a WB-67 to turn in. Per BaseCore, the end-of-row turnaround outer radius should be at minimum 60 feet, with 80 feet preferred. If your lot was designed for smaller vehicles, measure the turning radius before claiming a spot as WB-67 compliant.

Permit lead time is not a yard metric alone. ATRI survey data cited in the FHWA Truck Parking Development Handbook 2026 found drivers sacrifice an average of 56 minutes of revenue drive time per day searching for parking. If the nearest overnight permit takes five working days to obtain, drivers on your corridor are absorbing that search cost regardless of what your yard shows on its sign.

What should you do next?

  1. Pull your gate log for the past 30 days and sort entries by time of day into four bands: 6 AM to noon, noon to 6 PM, 6 PM to midnight, midnight to 6 AM.
  2. Measure every spot in your yard: width, length, and the drive aisle serving it. Flag any spot below the BaseCore minimums of 12 feet wide, 55 feet long, and 24 feet of one-way aisle.
  3. Request the daily truck VMT figure for your corridor segment from your state DOT freight office.
  4. Count publicly-owned competing spots within 10 miles using the Jason's Law Truck Parking Survey Results from FHWA, then add your own carrier-accessible spots to get total supply.
  5. Calculate your corridor access ratio (total supply divided by DVMT units of 100,000) and your vehicle fit rate (compliant spots divided by total spots).
  6. Call or email the city permit office that covers your address and ask for the standard processing time and fee for an oversize vehicle overnight permit; log the answer with the date.
  7. Record all three measures in a simple spreadsheet and repeat the exercise every 90 days so you can see whether your yard's position on the corridor is improving or eroding.

Where Propty fits

Propty Answer is your 24/7 AI front desk for calls and connected email, text and web inquiries. It uses your business information to help with questions, booking requests, connected payments and service requests for your team. Propty Get Found helps more customers discover your business on Google and in AI searches. Hear Answer handle a call for your industry, or start with a free Get Found audit.

Free Get Found audit

Do customers find your business when they ask Google or ChatGPT?

Free report: 3 questions across Google AI Overview and ChatGPT. No account needed; the report comes to your inbox.

Get my free audit

Sources

Statute references are current to our research and are not legal advice. Verify against current law in your state before acting.

Related questions

What is the WB-67 design vehicle and why does it matter for my spot dimensions?
The WB-67 is the standard 73-foot tractor-trailer combination used in U.S. highway design, and it is the reference vehicle for sizing truck parking stalls and drive aisles in U.S. facility planning. If your spots and aisles cannot accommodate a WB-67, a large share of the drivers on your corridor physically cannot use your yard. Per published industry layout guidance from BaseCore, stalls should be at minimum 12 feet wide and 55 feet long for a standard semi, with drive aisles at minimum 24 feet for one-way flow.
How do I find out how many truck parking spots are on my corridor?
The Jason's Law Truck Parking Survey Results published by FHWA maps publicly-owned supply by corridor and is the most accessible national dataset for this. Your state DOT freight office can supplement it with more current local counts. Add your own carrier-accessible spots to the public total to get the full supply figure for your corridor access ratio calculation.
Does overnight permit lead time affect my yard directly or only public streets?
If your yard is private property and you control access, you set your own check-in process and no city permit is required for drivers parking on your lot. Overnight permit lead times from city offices like Washington D.C. DDOT or Los Angeles LADOT apply when drivers need to park on public streets near your yard, for example when your lot is full or when a carrier needs to stage a trailer on a nearby block. Knowing those lead times helps you advise carriers accurately.
Why should I measure parking demand at night rather than during the day?
The FHWA Truck Parking Development Handbook 2026 documents that more than 90 percent of drivers reported difficulty finding parking between 7 PM and midnight, which is when Hours of Service rules force drivers off the road. A yard that appears underutilized at 2 PM may be completely full by 9 PM. Splitting your gate log into time bands gives you the real demand picture.
What is Jason's Law and why does it matter to a private yard operator?
Jason's Law is Section 1401 of MAP-21, Public Law 112-141, which established a national priority on addressing the shortage of long-term parking for commercial motor vehicles on the National Highway System and made FHWA the primary federal authority for truck parking data collection and facility standards. For a private yard operator, it matters because the survey data and design handbooks that FHWA publishes under that authority are the most reliable public sources for corridor supply counts and facility sizing standards.
Evan Thomas profile

About the author

Evan Thomas

Founder, Propty

Evan Thomas grew up in a family of property owners and operators, seeing firsthand how small businesses depend on people who are always on call. After working in tech, he returned to the challenges he knew from childhood: missed calls, daily interruptions, and owners with too little time for themselves. He founded Propty to bring practical AI to these businesses—helping owners serve their customers, grow their operations, and get more of their lives back.

Related answers

All Truck & trailer yards answers · How Propty works for truck & trailer yards

See whether ChatGPT and Google AI Overviews name your business when someone asks.

Run the free Get Found audit